Change Manager combines a graphical view of the datacenter with an asset manager that keeps track of everything installed in the datacenter -- and not just APC equipment. That data is then compared with readings taken from Capacity Manager, which keeps track of current space, power, and cooling stats based on data provided by APC UPSes, cooling systems, and NetBotz sensors. Due to the "live" nature of this system, we could turn off certain devices to see the impact on the overall datacenter.
The Change Manager and Capacity Manager combo was a bit overkill for our small HIG 319 server room, but for larger datacenters, the information provided can be hugely beneficial toward understanding day-to-day usage costs, long-term capacity planning, how green the datacenter really is, and numerous other concerns. Most important to SOEST is keeping the computing clusters cool. To this end, Change Manager and Capacity Manager can correlate all the information from the PDU's (current draw), plus heat and airflow readings from the NetBotz, and air output from the InRow cooling units to predict hotspots.
The total value of the APC contribution to the HIG 319 project totals nearly US$300,000 when you add up the racks, environmental management, security, power control systems, safety gear, and the software for managing it all.
Return to main feature Pimp my datacentre
- 1
- 2
- < previous
Click here for case studies, whitepapers and other useful vendor content When an IT disaster occurs, how handy it would be to push a button and start again as if nothing had happened.
Discover and learn more about CA XOSoft today.
PGP and Ponemon Institute Unveil Inaugural Australian Data Breach Study 2008 20 November, 2008 17:34:00
Symantec Cloud Services Transform Data Centre Operations Through Proactive Management 20 November, 2008 12:06:00
Verizon Business Offers Tips to Building a Successful Unified Communications and Collaboration Plan 20 November, 2008 12:04:00
NetApp Named 2008 Citrix Ready Solution of the Year by Citrix Systems 20 November, 2008 11:33:00
Extreme Networks Ethernet Transport lowers total cost of ownership for carrier metro networks 20 November, 2008 10:21:00
Dimension Data, La Trobe University and Windows Server 2008 partner to improve compliance
La Trobe University partnered with Dimension Data to deploy Windows Server 2008 and Network Access Protection technology to improve their existing network security solution.